Project Development

Resources

Mardie Salt Project Primary Seawater Intake Structure

Geomarine's Primary Seawater intake station project comprises the design, supply, fabrication, installation, commissioning and handover of six seawater intake pumps on the Pilbara coast of WA.
Read more
Infrastructure

AMC 1 Wharf Extension and New Finger Wharf

Geomarine team worked with Ertech to design and construct a wharf extension and new finger wharf at the Australian Marine Complex.
Read more
Defence

Armament Wharf Extension

Geomarine assisted the Duratec Ertech JV to deliver a 107-degree extension to the Armament Wharf at HMAS Stirling on Garden Island in Western Australia.
Read more
Defence

Preston Point Wharf Extension

Geomarine accompanied Ertech in the design and construction of a refurbished wharf to replace the existing Preston Point Wharf at the Leeuwin Barracks in Fremantle, WA.
Read more
Resources

Ichthys Landfall Crossing

Geomarine was on the Ichthys Landfall Crossing project to design and construct a 500m long steel pile cofferdam to enable the Gas Export pipeline crossing.
Read more