Pile Driving
Infrastructure
AMC 2 Wharf Deck Infill
The project is part of a program of works to upgrade infrastructure at the Common User Facility (CUF) at the Australian Marine Complex (AMC) in Henderson, WA.
Read moreResources
Quick Mud Creek Bridge Piling Works
Geomarine was engaged to install cased concrete piles at Mineral Resources’ Quick Mud Creek Bridge for the Onslow Iron Project.
Read moreInfrastructure
Berth PH1 and PH2 Lighting Tower Pile Installation
Installation of tubular steel-driven piles that will support new light towers located behind the working deck of Berths 1 and 2 for Pilbara Ports Authority (PPA).
Read moreResources
Mardie Salt Project Primary Seawater Intake Structure
Geomarine's Primary Seawater intake station project comprises the design, supply, fabrication, installation, commissioning and handover of six seawater intake pumps on the Pilbara coast of WA.
Read moreInfrastructure
Rottnest Island Berth 4 and 5 Reconstruction
Demolition of the existing concrete superstructure and supporting steel piles of the existing Main Jetty Berths 4 and 5 and the design and construction of the replacement concrete superstructure.
Read moreInfrastructure
AMC 1 Wharf Extension and New Finger Wharf
Geomarine team worked with Ertech to design and construct a wharf extension and new finger wharf at the Australian Marine Complex.
Read moreDefence
Armament Wharf Extension
Geomarine assisted the Duratec Ertech JV to deliver a 107-degree extension to the Armament Wharf at HMAS Stirling on Garden Island in Western Australia.
Read moreDefence
Preston Point Wharf Extension
Geomarine accompanied Ertech in the design and construction of a refurbished wharf to replace the existing Preston Point Wharf at the Leeuwin Barracks in Fremantle, WA.
Read moreResources
Ichthys Landfall Crossing
Geomarine was on the Ichthys Landfall Crossing project to design and construct a 500m long steel pile cofferdam to enable the Gas Export pipeline crossing.
Read more