With the completion of the northward extension of Berth 1 (AMC 1) in early 2023, attention turned to optimising the efficiency and functionality of Berth 2, known as AMC 2.
AMC 2 originally served as a berthing structure situated approximately 25 meters from the shoreline. Through the infill of the open area of approximately 1,000 square meters, Geomarine transformed the berthing infrastructure into a continuous wharf deck, which has increased the wharf’s versatility for users.
AMC 2 Wharf Deck Infill project involved the design and construction of a new deck structure consisting of driven tubular steel pile foundations, supporting precast reinforced concrete beams, and deck planks with an in-situ concrete slab topping.